Moreno Valley Utility Transportation Electrification Assessment and Roadmap

Transportation Electrification Case StudyMoreno Valley Utility Transportation Electrification Assessment and RoadmapOverview In 2017, AESC completed a project with Moreno Valley Utility (MVU). MVU was interested in assessing municipal transportation electrification (TE) need and creating a plan to increase EV use. AESC’s planning team used a road mapping process to bring the Utility’s vision and goals…

University of California San Diego Electric Vehicle Charger Grid Impact Study

Transportation Electrification Case StudyUniversity of California San Diego Electric Vehicle Charger Grid Impact StudyOverview In 2016 AESC provided a broad range of transportation electrification and grid impact analysis services to University of California San Diego (UCSD), California Energy Commission, and SDG&E. The project provided proof of concept for university implementation of electric vehicle (EV) charging…

California’s Statewide Zero Emissions Vehicle Infrastructure Plan

Transportation Electrification Case StudyCalifornia’s Statewide Zero Emissions Vehicle Infrastructure PlanOverview From 2015-2017 AESC provided the California Energy Commission (CEC) technical and policy assistance for California’s Statewide Zero Emissions Vehicle (ZEV) Infrastructure Plan, developing a five-year plan to promote ZEVs, including hydrogen. This multi-phase project began with a DC Fast Charging (DCFS) Corridor Assessment that led…

RAPIDS – Wastewater Plant Upgrades in the NE Bay Area

Water Practice Case StudyWastewater Plant Upgrades in the NE Bay AreaOutcomes$0Total Cost Savings Identified0Proposed Savings (kWh)0Proposed Savings (Therms)Main Problems Lighting HVAC Pumping equipment Compressed air Overview Plant Type Primary Treatment (Flocculation and Sedimentation) Plant Size (MGD) 20 The AESC team was invited to this drinking water treatment facility to perform a detailed integrated energy audit…

RAPIDS – Wastewater Plant in South Central Arizona

Water Practice Case StudyWastewater Plant in South Central ArizonaOutcomes$0Total Cost Savings Identified0Proposed Savings (kWh)0Proposed Savings (kW)Main Problems Non-automated control systems Aging infrastructure and deferred maintenance Overview Plant Type Activated Sludge Plant Size (MGD) 203 AESC coordinated, prepared for, and participated in an on-site launch meeting with this agency’s senior staff. AESC supported the delivery of…

RAPIDS – Wastewater Plant Upgrades in Southern California – Project 2

Water Practice Case StudyWastewater Plant Upgrades in Southern California – Project 2Outcomes$0Total Cost Savings Identified0Proposed Savings (kWh)0Proposed Savings (kW)Main Problems Non-automated control systems Excessive hydrogen sulfide generation in collection system and mitigation activities Overview Plant Type Activated Sludge Plant Size (MGD) 15 The AESC team was invited to this wastewater agency to develop a city-wide…